metro station project at Nordhavnen

90.000 m3 surplus soil removes from the metro station project at Nordhavnen

The projected metro station at Nordhavnen is a part of the new Metro City Ring in Copenhagen. The excavation includes the station and a tunnel connecting the present S-train station with the projected metro station. A travellator of 90 meter will make an easy access between the stations. The metro station will be situated northeast of the intersection between Århusgade and Kalkbrænderihavnsgade.

About 90.000 m3 surplus soil will be removed of the former coastline which was manmade for the construction of the Freeport (Frihavnen) back in the 1890’s.

Builder

MetNord JV I/S

Assignment

JORD•MILJØ A/S had obtained the environmental permits and supervision during the removal of construction surplus soil.

Turnover

DKR. 1,9 mio. excl VAT

Execution period

2014-2016

Should we call you up?

✔ Get a free and non-binding offer
✔ Get answers to your questions
✔ Get advice and guidance

Or be called up for something else!

Fill quickly and easy the form and we will call you as soon as possible.